库存调整日期Date Inventory Adjust 作废日期D ate Obsolete 收到日期Date Received 交付日期Date Released 需求日期Date Required 发货日期Date to Pull 空负荷Dead Load 需求管理Demand Management 需求Demand 实际能力Demonstrated Capacity 非独立需求Dependent Demand 直接增减库存处理法Direct-deduct Inventory Transaction Processing 发料单Disbursement List 派工单Dispatch List 分销资源计划Distribution Resource Planning (DRP) 鼓-缓冲-绳子Drum-buffer-rope 经济订货批量Economic Order Quantity (EOQ) 工程变更生效日期Engineering Change Effect Date 工程变更生效单Engineering Change Effect Work Order 工程停止日期Engineering Stop Date 例外控制Exception Control 呆滞材料分析Excess Material Analysis 急送代码Expedite Code 加工订单Fabrication Order 补足欠交Fill Backorder 总装提前期Final Assembly Lead Time 确认的计划订单Firm Planned Order 固定订货批量F ixed Order Quantity 集中预测Focus Forecasting 完全跟踪Full Pegging 通用生产管理原则Generally Accepted Manufacturing Practices 毛需求Gross Requirements 在制品库存In Process Inventory 独立需求Independent Demand 投入/产出控制Input/ Output Control 检验标识Inspection ID 厂际需求Interplant Demand 库存周转率Inventory Carry Rate 仓库库位类型Inventory Location Type 库存周转次数Inventory Turnover 发送订单Issue Order 项目记录Item Record 物料项目Item 加工车间Job Shop 准时制生产Just-in-time (JIT) 看板Kanban 人工工时Labor Hour 最后运输日期Last Shipment Date 提前期Lead Time